USPS electric vehicle fleet behind schedule with $3B in taxpayer funds spent — and only 612 trucks built

Ruralinfo

Administrator
Staff member
WASHINGTON — The US Postal Service’s promised all-electric fleet is still woefully behind schedule, with more than $3 billion in taxpayer funding out the door and just 612 of the expected 35,000 battery-powered delivery trucks built, according to a letter sent to Sen. Joni Ernst (R-Iowa) and obtained by The Post. Former President Joe Biden’s 2022 Inflation Reduction […]
 
Back
Top