Some carriers in our office, including myself, was in 2080 problems due to this. They had the gall to demand us to take annual leave to help us get out from under the 2080 limelight. I even called my Union Director and she responded that we agree, as rural carriers, that we will not go over our yearly time limits. The only way I could of won a grievance on this was if they had refused leave requests and I had proof. This is total nonsense. If your route is not evaluated properly this will be the end result. But, thanks for the advice. This butt will be slowing down to a snails crawl.
When the Union rep. with whom you spoke told you , "........ that we agree, as rural carriers, that we will not go over our yearly time limits. " , that is NOT totally accurate. First off, some route classifications do not have a high/low option. Hence, no leave commitment is required to be signed. Secondly, if one does not have 10 years in career service, one does NOT have the option to elect the higher route classification so again.................................no leave commitment is required to be signed. It is management's responsibility to keep an eye on your hours. The part where you say , " The only way I could of won a grievance on this was if they had refused leave requests and I had proof. " is a statement I hope DID NOT come from your rep.
From The M-38 ;
.12 Form 4240 must be examined at the end of each accounting period to ensure that
complete, accurate, and current information (i.e. boxes, stops, route mileage, schedule,
actual
and cumulative work hours, etc.) is shown on the front of the form; and the form is signed by
the rural carrier and the postmaster or designated supervisor
There is an area at the top right of the 4240 where your actual work hours are SUPPOSED to be present.
Also, from The M-38 ;
.13 Managers must review the form frequently to insure that the carrier will not exceed 2080
actual workhours (Fair Labor Standards Act, See: Part 214.3) during the guarantee period.
What that means is YOUR management is SUPPOSED to be aware of your work hours and NOT wait for a phone call or email from District to let them know you are projected to be or are already in 2080 issues.
Again, from The M-38 ;
.331 The projection and review of rural work-hours must be conducted at the completion of
pay periods, 04, 10, 13, 16, 18, 20, 21, and 22.
.332 If a review reveals that an employee may have potential FLSA problems. a projection
and review of the workhours of that employee must be conducted on a pay-period by
pay-period basis until the problem is resolved.
Don't let 'em LWOP you. Should be ADMIN. leave.