• Everyone, please help make our jobs easier and choose the correct category. Thank you

Can your route be cut at any time now?

After the most recent mini mail survey (Aug-Sep), my route went down by one hour to a 44k. I got form 50 in the mail with the new info and an effective date of 10-03-2026. It sucks, but I understand that.

Right after that survey, I had to go out on approved FMLA leave. Haven’t worked for 10 weeks. Now today I get another form 50 in the mail with an effective date of 11-14-2026. The only changes are that my route went down to a 43k and my mileage dropped from 11 to 10.

I thought they could only cut you every six months after a survey. I heard about pilot programs where they were experimenting with biweekly route adjustments or something like that. I am not in one of those stations.

Am I getting screwed because RCAs are carrying the route or it’s being split every day between multiple carriers? How is a November cut possible and/or justified?
 
The new route evaluations started on the 14th. So your last count you lost an hour and it went into effect 11/14. If you have questions about last count results speak with your postmaster. You should have been updated what was happening to your route in your absence.
 
Your route wasn't cut from a traditional / conventional adjustment. The mileage change ( base hour ) is what reduced the evaluation. You can , contractually, request a remeasurement. Was your route a victim of that rural route "optimization" scheme ? You know, where they screw around with the line of travel ? there is also this from Article 9 of The Nat'l Agreement ;

10. Service Changes

When service changes occur, the Employer shall
promptly adjust the route evaluation as determined
by the formula below, and the compensation will be
adjusted, as appropriate. Such interim adjustment
shall be made by application of a formula based upon
(1) the appropriate box factor for the route, added to
the volume factor for the route, multiplied by the boxes
added to or subtracted from the route since the last
evaluation, and (2) the change in miles, utilizing the
appropriate factors of the drive speed matrix to
determine the time to be added or subtracted from
the route evaluation

So, while there now is a grow as you go , there is also a lose as you go.
 
The new route evaluations started on the 14th. So your last count you lost an hour and it went into effect 11/14. If you have questions about last count results speak with your postmaster. You should have been updated what was happening to your route in your absence.


This link says new evals go into effect oct 3 which jives with the first cut from 45 to 44.

Now it inexplicably dropped again from 44 to 43 effective nov 14
 
Your route wasn't cut from a traditional / conventional adjustment. The mileage change ( base hour ) is what reduced the evaluation. You can , contractually, request a remeasurement. Was your route a victim of that rural route "optimization" scheme ? You know, where they screw around with the line of travel ? there is also this from Article 9 of The Nat'l Agreement ;

10. Service Changes

When service changes occur, the Employer shall
promptly adjust the route evaluation as determined
by the formula below, and the compensation will be
adjusted, as appropriate. Such interim adjustment
shall be made by application of a formula based upon
(1) the appropriate box factor for the route, added to
the volume factor for the route, multiplied by the boxes
added to or subtracted from the route since the last
evaluation, and (2) the change in miles, utilizing the
appropriate factors of the drive speed matrix to
determine the time to be added or subtracted from
the route evaluation

So, while there now is a grow as you go , there is also a lose as you go.
Thank you for the information. I appreciate that. As far as I know, my route was not part of any optimization. Guess ill have to go in and request a measurement and do my mapping to hopefully bump it back up
 
After the most recent mini mail survey (Aug-Sep), my route went down by one hour to a 44k. I got form 50 in the mail with the new info and an effective date of 10-03-2026. It sucks, but I understand that.

Right after that survey, I had to go out on approved FMLA leave. Haven’t worked for 10 weeks. Now today I get another form 50 in the mail with an effective date of 11-14-2026. The only changes are that my route went down to a 43k and my mileage dropped from 11 to 10.

I thought they could only cut you every six months after a survey. I heard about pilot programs where they were experimenting with biweekly route adjustments or something like that. I am not in one of those stations.

Am I getting screwed because RCAs are carrying the route or it’s being split every day between multiple carriers? How is a November cut possible and/or justified?

It would be worth looking in to if member of management falsified your signature and did the mapping without your consent or knowledge. Since grow-as-you-go was implemented into the contract our routes evaluation can change monthly based on the mapping data, if mgmt goes into the program directly and messes with your dpm/ltm data that is.
 
It would be worth looking in to if member of management falsified your signature and did the mapping without your consent or knowledge. Since grow-as-you-go was implemented into the contract our routes evaluation can change monthly based on the mapping data, if mgmt goes into the program directly and messes with your dpm/ltm data that is.
Will do thank you Hero of Time
 
Back
Top