RRECS only requires a Stand-Up Talk since there is nothing to negotiate for time standards. It's all cut & dry. The list of things to count is tiny and almost nothing gets timed.Is this still a " thing?" ..isn't management to hold a precount conference like a week before the mms?
Thank you for any information
Omg that's awful ...we never had a pre count stand up, have a bs city supervisor that doesn't even know how to spell mms,admittedly...it's criminalThis place is a joke. Last MMS I dropped from 45k to 44k because PM entered 0ft of daily dismount distance instead of 1035ft. Immediately disputed, Immediately won. 6 months later still not fixed/reflected/paid, and into next MMS. JOKE!
Give this a looksee , page 3. https://www.ruralinfo.net/shared-files/104113217/?Mini Mail Survey Presentation 2-22-2025.pdfOmg that's awful ...we never had a pre count stand up, have a bs city supervisor that doesn't even know how to spell mms,admittedly...it's criminal
They are literally playing around like itsca joke ..tried to get withdrawal removed, moved our parcel hampers 2x before measuring then next day moved to a different spot. Took away out conveyances apcs 3vweeks ago so, now, 2 trips to get parcels and conveyances which are now parcel hampers...smh
4 mos to go...
They have done NOTHINGGive this a looksee , page 3. https://www.ruralinfo.net/shared-files/104113217/?Mini Mail Survey Presentation 2-22-2025.pdf
Unfortunately, the number of conveyances doesn’t matter. It’s 1 measurement to the furthest conveyor & back to where you case.Omg that's awful ...we never had a pre count stand up, have a bs city supervisor that doesn't even know how to spell mms,admittedly...it's criminal
They are literally playing around like itsca joke ..tried to get withdrawal removed, moved our parcel hampers 2x before measuring then next day moved to a different spot. Took away out conveyances apcs 3vweeks ago so, now, 2 trips to get parcels and conveyances which are now parcel hampers...smh
4 mos to go...
This is f ing criminal..smh..I just can't understand why this is allowed to continueUnfortunately, the number of conveyances doesn’t matter. It’s 1 measurement to the furthest conveyor & back to where you case.
The number of conveyances that we are credited with can change daily & is based on the number of parcels the route deliverers each day. Size also doesn’t matter in the conveyance equation.
This is correct yet IMO wrong, the size of many Amazons will take up 1 alone.Unfortunately, the number of conveyances doesn’t matter. It’s 1 measurement to the furthest conveyor & back to where you case.
The number of conveyances that we are credited with can change daily & is based on the number of parcels the route deliverers each day. Size also doesn’t matter in the conveyance equation.
And when you have 100 small pkgs in 1 hamper, we get 3 hamper creditsThis is correct yet IMO wrong, the size of many Amazons will take up 1 alone.
That was what the Engineers came up with & arbitration agreed.This is f ing criminal..smh..I just can't understand why this is allowed to continue
If you have multiple parcel sorting areas. The footage should be to each area and back then added for total daily footage credit. You aren't allowed to push two pieces of equipment at the same time per safety.They have done NOTHING