mail-lady-mail-lady
New member
Small office, 2 of 4 routes were 47(overburdened).
Cuts were made and an Aux route was created.
The 2 routes were taken down to 51:00/43K routes.
The 2 routes have now dropped below a 43...can they now take back off of the aux route to build back up to a minimum 43 or more?
Does the entire aux route have to be absorbed to do so or can only a small portion be taken off as long as the aux will be at a minimum of 12hours?
Cuts were made and an Aux route was created.
The 2 routes were taken down to 51:00/43K routes.
The 2 routes have now dropped below a 43...can they now take back off of the aux route to build back up to a minimum 43 or more?
Does the entire aux route have to be absorbed to do so or can only a small portion be taken off as long as the aux will be at a minimum of 12hours?