• Everyone, please help make our jobs easier and choose the correct category. Thank you

Overwhelmed and disgusted

If you try to work under your evaluation during this time you will only succeed in breaking down your body for NO extra pay.
My eval is not correct for the volume. No one should care at all about the eval awarded on past volumes, it is not a logical concept. We dont even have the ability to verify any numbers, so in my opinion, it is always wrong. We are NEVER told the approximate time the current volunes are adding up against the eval. We cant predict if the 11.5 hour days will get averaged with a consistent 5 hour day in the future
The problem is density, absorption and the desire to get the days over with. I have my own carrot on the end of a stick. That carrot is my family.
I dont like that I overperform like a puppet so I can have evenings with my family. Some one correct me if I am wrong, but as far as I am aware this system does not protect us from daily volumes. As far as I am aware, how the system captures those volunes is uncertain when 2 carriers are delivering at the same time at different places on the same route. It would just be lovely to know what the system captures on a daily and weekly basis and how that is generating a future eval. That might be a better protection from unknowingly working in excess toward physical and mental exhaustion.
 
My eval is not correct for the volume. No one should care at all about the eval awarded on past volumes, it is not a logical concept. We dont even have the ability to verify any numbers, so in my opinion, it is always wrong. We are NEVER told the approximate time the current volunes are adding up against the eval. We cant predict if the 11.5 hour days will get averaged with a consistent 5 hour day in the future
The problem is density, absorption and the desire to get the days over with. I have my own carrot on the end of a stick. That carrot is my family.
I dont like that I overperform like a puppet so I can have evenings with my family. Some one correct me if I am wrong, but as far as I am aware this system does not protect us from daily volumes. As far as I am aware, how the system captures those volunes is uncertain when 2 carriers are delivering at the same time at different places on the same route. It would just be lovely to know what the system captures on a daily and weekly basis and how that is generating a future eval. That might be a better protection from unknowingly working in excess toward physical and mental exhaustion.
then stop. it is what it is. i have the same pace every day. some days i don't get done until 10. others, done at 3. i refuse to beat my body up by rushing. i don't care to exhaust myself by fretting over what the system is doing or not doing. i know ahead of time about when i'll be done by looking at what i have for the day. been doing this a long time and my guesstimates are pretty spot on.

i don't know that there is specific language that "protects" us from excess volume in a day, but if you have semi-competent management, they will arrange for you to have auxiliary assistance to get you off the street. whether that is giving a sub a portion of your route or running parcels is up to them.

they'll be starting that in the next few days...the Christmas no-overtime for rurals period is looming.
 
Blah, I dont personally have much patience for delayed monetary reward.
There is no guarantee the excess will continue and if it doesnt the extra effort get washed away. I cant make sense of this component to myself.
the money is a part of the issue. the wear and tear on your body is the much bigger component that can never be compensated. bad joints and worn tendons are forever. even replacement surgeries have very definite limits over natural Material.
it's a concept I've never had success with explaining to a rural. other crafts understand. rurals are mind washed into a type of speed behavior by USPS and it's a bigger con than Jim Jones ever attempted.
it's also why rural carrier always have the highest death rate % year over year. they choose to chase a non-existent carrot.
 
Auxiliary assistance is governed under Art. 9.2.C.8.b

Functionally only for routes over the maximum standard hours, or for routes that are regularly taking over 48 hours to complete over the course of their standard work week.
 
Last edited:
While there are several other options / suggestions in The M-38 to remedy the 2080 limit , here are a couple that actually support the carrier.

1) Correct items beyond the carrier’s control such as office layout, route layout, scheduling,
etc. to the extent practical.

That "etc" can and does include DRASTIC fluctuations in day to day volume which would include parcels.

I see where the OP stated , " Hadn't been on here for awhile because since my route adjustment I have been worked to death." So, since the route has ALREADY been adjusted it would stand to reason that this from The M-38 would apply .

(4) If it is not feasible to adjust the route, is it more cost effective to provide auxiliary
assistance or to let the carrier work the FLSA overtime.
 
Auxiliary assistance is governed under Art. 9.2.C.8.b

Functionally only for routes over the maximum standard hours, or for routes that are regularly taking over 48 hours to complete over the course of their standard work week.
I have a 50 k route. Does this mean if my route evaluation is above a 48K, that I should automatically get auxiliary assistance for time above the 48 hours? As in 2 hours a week, Or do I only get assistance if I can not do the route in 48 or less hours a week?
 
Art 9 specifically calls out assistance being authorized in relation to the lesser of the two options; ie whichever would provide the least assistance. So, if you are completing your overburdened route in less time than a 48K is apportioned, then you would generally not have a contractual right to auxiliary assistance.

(Not to pass judgment one way or another on the morality of the issue, but that's the cold contractual language)

eg., your route has 51 hours per 5 days, but you finish in 47. No assistance. 47-48 =-1

Your route has 60 hours per 5, but you finish in 57. You are entitled to 9 hours per week. 57-48 =9

Your route has 60 hours per 5, but you finish in 65, you are only entitled to 12 hours. 60-48 =12
 
Art 9 specifically calls out assistance being authorized in relation to the lesser of the two options; ie whichever would provide the least assistance. So, if you are completing your overburdened route in less time than a 48K is apportioned, then you would generally not have a contractual right to auxiliary assistance.

(Not to pass judgment one way or another on the morality of the issue, but that's the cold contractual language)

eg., your route has 51 hours per 5 days, but you finish in 47. No assistance. 47-48 =-1

Your route has 60 hours per 5, but you finish in 57. You are entitled to 9 hours per week. 57-48 =9

Your route has 60 hours per 5, but you finish in 65, you are only entitled to 12 hours. 60-48 =12
Thanks for the info
 
Back
Top