U caught my attention
Well-known member
Right! I dont understand why they would be compelled to give us aux assistance. What language protects us from excess volumes in a day?Good luck with that.
Right! I dont understand why they would be compelled to give us aux assistance. What language protects us from excess volumes in a day?Good luck with that.
My eval is not correct for the volume. No one should care at all about the eval awarded on past volumes, it is not a logical concept. We dont even have the ability to verify any numbers, so in my opinion, it is always wrong. We are NEVER told the approximate time the current volunes are adding up against the eval. We cant predict if the 11.5 hour days will get averaged with a consistent 5 hour day in the futureIf you try to work under your evaluation during this time you will only succeed in breaking down your body for NO extra pay.
then stop. it is what it is. i have the same pace every day. some days i don't get done until 10. others, done at 3. i refuse to beat my body up by rushing. i don't care to exhaust myself by fretting over what the system is doing or not doing. i know ahead of time about when i'll be done by looking at what i have for the day. been doing this a long time and my guesstimates are pretty spot on.My eval is not correct for the volume. No one should care at all about the eval awarded on past volumes, it is not a logical concept. We dont even have the ability to verify any numbers, so in my opinion, it is always wrong. We are NEVER told the approximate time the current volunes are adding up against the eval. We cant predict if the 11.5 hour days will get averaged with a consistent 5 hour day in the future
The problem is density, absorption and the desire to get the days over with. I have my own carrot on the end of a stick. That carrot is my family.
I dont like that I overperform like a puppet so I can have evenings with my family. Some one correct me if I am wrong, but as far as I am aware this system does not protect us from daily volumes. As far as I am aware, how the system captures those volunes is uncertain when 2 carriers are delivering at the same time at different places on the same route. It would just be lovely to know what the system captures on a daily and weekly basis and how that is generating a future eval. That might be a better protection from unknowingly working in excess toward physical and mental exhaustion.
the money is a part of the issue. the wear and tear on your body is the much bigger component that can never be compensated. bad joints and worn tendons are forever. even replacement surgeries have very definite limits over natural Material.Blah, I dont personally have much patience for delayed monetary reward.
There is no guarantee the excess will continue and if it doesnt the extra effort get washed away. I cant make sense of this component to myself.
I have a 50 k route. Does this mean if my route evaluation is above a 48K, that I should automatically get auxiliary assistance for time above the 48 hours? As in 2 hours a week, Or do I only get assistance if I can not do the route in 48 or less hours a week?Auxiliary assistance is governed under Art. 9.2.C.8.b
Functionally only for routes over the maximum standard hours, or for routes that are regularly taking over 48 hours to complete over the course of their standard work week.
Thanks for the infoArt 9 specifically calls out assistance being authorized in relation to the lesser of the two options; ie whichever would provide the least assistance. So, if you are completing your overburdened route in less time than a 48K is apportioned, then you would generally not have a contractual right to auxiliary assistance.
(Not to pass judgment one way or another on the morality of the issue, but that's the cold contractual language)
eg., your route has 51 hours per 5 days, but you finish in 47. No assistance. 47-48 =-1
Your route has 60 hours per 5, but you finish in 57. You are entitled to 9 hours per week. 57-48 =9
Your route has 60 hours per 5, but you finish in 65, you are only entitled to 12 hours. 60-48 =12
The contractual language approves overtime for any carriers that work more than 12 hours in one day or 57:36 hours/week. There is no contractual language that pays any carrier overtime for working over their evaluation if under 12/day or 57:36/week.Art 9 specifically calls out assistance being authorized in relation to the lesser of the two options; ie whichever would provide the least assistance. So, if you are completing your overburdened route in less time than a 48K is apportioned, then you would generally not have a contractual right to auxiliary assistance.
(Not to pass judgment one way or another on the morality of the issue, but that's the cold contractual language)
eg., your route has 51 hours per 5 days, but you finish in 47. No assistance. 47-48 =-1
Your route has 60 hours per 5, but you finish in 57. You are entitled to 9 hours per week. 57-48 =9
Your route has 60 hours per 5, but you finish in 65, you are only entitled to 12 hours. 60-48 =12
I did second trip today and didn't get finished until 11 pm. They dumped.over 4000 packages on us while we were out. Just so tired of all of this!I did cause I wanted to. Put it down as second trip. Did load time and trip to doors and evrything.
And that is just whatnI did today, 23 miles worth!You should have been blunt in your response, when you said "Alright, but I should really take these so tomorrow I will not need to make an even longer second trip. And I'll take the scenic route at three minutes a mile!"
Hm?The contractual language approves overtime for any carriers that work more than 12 hours in one day or 57:36 hours/week. There is no contractual language that pays any carrier overtime for working over their evaluation if under 12/day or 57:36/week.
If you can convince your manager to pay you for any hours that you work over your paid hours, more power to you, but it's not contractual.